Independent M&E surveying across approximately 10–12 Metropolitan Police properties in London — delivered over 3–4 months alongside other commitments for Sodexo FM.
10–12 sites · Sole surveyor · 3–4 months
Exterior of New Scotland Yard used as a recognisable Metropolitan Police landmark. Operational site photography remains restricted.
New Scotland Yard © Lewis Clarke (CC BY-SA 2.0) via Geograph Britain and Ireland.
- Sector
- Public Sector / Policing
- Location
- London, UK
- Estate
- Metropolitan Police estate
- FM provider
- Sodexo
- Sites
- Approximately 10–12 locations
- Surveyor
- Sole surveyor
- Timeline
- Approximately 3–4 months, alongside other commitments
- Data capture
- Electronic
The commission covered Mechanical & Electrical surveys across approximately 10–12 properties within the Metropolitan Police estate across London. Sites ranged from active police stations to call centres and other specialist facilities, each with different operational requirements and M&E systems.
Delivery was through Sodexo as the Facilities Management provider. Surveys were carried out independently across the estate, with full ownership of the survey process and electronic data capture over approximately 3–4 months alongside other project commitments.
- Carry out M&E surveys across approximately 10–12 sites
- Inspect and record M&E assets and systems
- Capture asset information electronically and consistently across building types
- Work independently and manage the survey programme
- Adapt the survey approach to each operational environment
- Provide collected survey information for use by the FM team
- Building types and operational environments varied widely, requiring an adaptable but consistent capture approach.
- Active police facilities demanded a professional, considerate working method that avoided unnecessary disruption.
- As sole surveyor, workload, travel and site prioritisation had to be managed across London while other commitments continued.
- Geographic spread across the estate required efficient planning of travel and visit sequencing.
- M&E surveys were completed across approximately 10–12 properties over a three-to-four-month period.
- An electronic record of surveyed M&E assets was produced across a diverse range of operational buildings, supporting the FM provider.
- The commission demonstrated independent multi-site programme delivery within security-sensitive, operational environments — including police stations, call centres and specialist facilities.
Discuss a similar commission.
Speak directly with the director about estate scale, programme and deliverables.
Related case studies.
Corporate / CommercialNike International Asset Survey
International spatial survey and asset register delivery across Nike offices in the Netherlands, Spain and Poland — approximately 36,000 m² captured in around two weeks using 360° camera technology.
Read case study →
HealthcareSwindon Hospital — M&E Asset & Environmental Survey
Large-scale M&E asset verification and environmental testing across a live hospital estate — approximately 3,500 rooms delivered over five months with a five-person survey team.
Read case study →